BIM platform for architecture. Link CAD command for map underlays.
Developer: Autodesk · Category: CAD Software
| Coordinate System | Auto UTM (meters) |
|---|---|
| Units | meters |
Revit works best with the map as a linked CAD file on a site plan: you get buildings, roads and water as a background for your model without bringing thousands of lines into the project. We recommend DWG; DXF, IFC and PDF are alternatives.
By default CAD files are delivered in the UTM zone of the centre of your area: EPSG:326xx in the northern hemisphere, EPSG:327xx in the southern one (for example, central Berlin is UTM zone 33N, EPSG:32633). UTM is a metric, conformal projection, so lengths and areas measured in the drawing match reality within about 0.1 %. You can pick a different coordinate system in the export settings before you start the export.
UTM coordinates are large numbers: eastings are hundreds of thousands of metres and northings are millions of metres. The geometry therefore lies far from the drawing origin — this is expected and keeps the map georeferenced.
Revit warns about geometry far from the internal origin, which is why Center to Center is the recommended positioning. After Acquire Coordinates the shared coordinates of the project match the UTM coordinates of the map.
The file is in metres. Always set Import units to Meter in the Link CAD dialog — Auto-Detect may guess wrong, and the map then comes in 1000 or 3.28 times too large or too small.
Map objects are split into layers by OpenStreetMap feature type — buildings, roads and paths, railways, water, green areas and land use, labels and so on — and each layer has its own colour, so the drawing reads like the map. Turn layers off, lock or recolour them with the usual tools of the program.
In Revit use Visibility/Graphics (VG) → Imported Categories → the linked file to hide or recolour individual map layers in each view.
Link CAD. A link keeps the project light and can be reloaded when you export an updated map.
Link it on the Site plan, or check that Current view only was not ticked when you linked it in another view.
The IFC export carries buildings as IFC entities; DWG gives a 2D underlay.